Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 18 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched.
| – |
| Not verified |
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Modern Spaces Felicity Engrace 1 in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner · Survey 40/1
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 10; 40/1, Kada Agrahara village, Anekal taluk
Title deed filed with K-RERA, pp. 1, 16 · See it in Documents
Transfer of the land
Sale deed
Survey 40/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Yamare Panchayat · Survey 40/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan APA/CC/674/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/190722/005087
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 15 Jun 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched.
| Survey numbers | 40/1 | |
|---|---|---|
| Land extent, Sy 40/1 | 1 Acre 11 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,159 sq m | |
| Khata | E Khatha · Yamare Panchayat · 1 Mar 2022 | |
| Sale deed | Dated 18 Sep 2021 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 40/1 | 3 | 2 acres 23 guntas | 1 acre 11 guntas | Differs: 1 acre 17 guntas apart | 0 |
| Building plan (BMRDA) | Sanctioned 23 Mar 2022 · No. APA/CC/674/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order W-126772 · issued 15 Mar 2024 | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 1 Jun 2025 |
| Land conversion | Converted 13 Aug 2010 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 40/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 115 m² 88.2%2BHK 11.8%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 8 | 7,255 |
| 3BHK | 60 | 74,368 |
| Engrace 3 | under 10 m | Locked | |
|---|---|---|---|
| Engrace 4 | 150 m | Locked | |
| Engrace Vista | about 0.5 km | Locked | |
| Nambiar District 25 Phase 2 | about 1.5 km | Locked |
| Modern Spaces Felicity Engrace 1 This project | This project is the point the others are measured from | 1 Jun 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Engrace 3 | under 10 m | 1 Jun 2026 | 100% (76 of 76) | Locked |
| Engrace 4 | 150 m | 31 Dec 2026 | 100% (145 of 145) | Locked |
| Engrace Vista | about 0.5 km | 30 Dec 2028 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 6.9 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 310 m to the north-west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.31 (89 covered spaces for 68 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 21 Mar 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 1 Jun 2025 | |
|---|---|---|
| Schedule end | 1 May 2025 | |
| RERA completion date | 1 Jun 2025 | |
| Work began, as filed | 1 Jul 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Site inspected 24 May 2022 | |
| Engineer's certificate, registration | Dated 22 May 2022 | |
| Chartered accountant's certificate, registration | Dated 29 Jun 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.57 Cr 14.9%Development · ₹26.00 Cr 85.1%
| Estimated cost | ₹30.57 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹25.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (64) 94.1%Unsold (4) 5.9%
| Flats sold, at completion | 64 | |
|---|---|---|
| Flats unsold, at completion | 4 | |
| Flats in the phase | 68 |
| Escrow bank | FEDERAL BANK OF INDIA · Billapura | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 15 Jun 2022 | Review |
| Building plan (BMRDA) | Sanctioned 23 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · Billapura | |
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Engrace 3, price locked; Engrace 4, price locked; Suyug's Saffron, price locked; Acorn Hive, price locked; Vistar White Pearl, price locked.
| Suyug's Saffron | 1.7 km | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 2 km | Locked |
|---|
| Acorn Hive | 2.8 km | Locked |
|---|
| Vistar White Pearl | 3.4 km | Locked |
|---|
| Mahidhara Harmony | about 4 km | Locked |
|---|
| Sowparnika Olivia Nest | about 5 km | Locked |
|---|
| Coevolve Florenza | 5.2 km | Locked |
|---|
| Orion Heights | about 5 km | Locked |
|---|
| 46% (181 of 392) |
| Locked |
| Nambiar District 25 Phase 2 | about 1.5 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
|---|
| Suyug's Saffron | 1.7 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 2 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹33,500 /mo · 8 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹32,000 /mo · 19 listings | |
| Rent, 1BHK, 3 km | ₹17,000 /mo · 5 listings | |
| Rent per sq ft, 3 km | ₹31.3 /mo, as listed · 24 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 55 (33 with an approximate location) | |
|---|---|---|
| Flats in them | 18,233 | |
| Booked | 10,347 of 18,233 (57%) | |
| Unsold | 7,886 | |
| Booked a month, pooled | 299 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Yamare Grama Panchayathi) | |
| Nearest city water main | 6.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 8.8 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 50.3 | 52 | 37.7 |
| MG Road (CBD) | 27.3 | 34 | 21.0 |
| Manyata Tech Park | 31.5 | 39 | 25.1 |
| ITPL, Whitefield | 17.1 | 20 | 13.8 |
| Ecospace, Bellandur ORR | 16.1 | 23 | 10.8 |
| Electronic City Ph 1 | 13.2 | 20 | 9.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |