Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Adarsh Greens Phase 1Extended to 31-10-2026 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 366–635 sqft carpet (as filed) | Oct 2025 |
| Adarsh Greens Phase 2Extended to 31-05-2027 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 635 sqft carpet (as filed) | May 2026 |
| Adhishree SunshineWithdrawn | ADHISHREE VENTURES INDIA PVT LTD | Apartment | – | Sep 2021 |
| Affinity SowparnikaCompleted · OC 29-04-2019 | Affinity Projects | Apartment | – | Completed |
| Arvind SkylandsCompleted · OC 03-02-2020 | Arvind SmartSpaces Limited | Apartment | 1,063 sqft carpet (as filed) | Completed |
| AureliusActive · 96% built | ECLECTIC HARBOUR CREATORS PRIVATE LIMITED | Apartment | 1,849 sqft carpet (as filed) | Aug 2027 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Bcm PanacheActive · 40% built | BCM INFRASTRUCTURE PRIVATE LIMITED | Apartment | 1,102–4,865 sqft carpet (as filed) | Mar 2029 |
| Bren Northern LightsCompleted · OC 23-03-2023 | BREN CORPORATION PRIVATE LIMITED | Apartment | – | Completed |
8 of 40 other projects in Jakkur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Skyline Waterfront is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| 4square Park Sierra | about 1 km, to a locality centre | Locked | |
|---|---|---|---|
| Legacy Salvador | about 1.5 km, to a locality centre | Locked | |
| Assetz Soho & Sky | about 2.5 km, to a locality centre | Locked | |
| Cumins Sanctum | about 2.5 km, to a locality centre | Locked | |
| Skyline Waterfront This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| 4square Park Sierra | about 1 km, to a locality centre | 31 Dec 2029 | 8% (14 of 170) | Locked |
| Legacy Salvador | about 1.5 km, to a locality centre | 31 Dec 2026 | 71% (119 of 167) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km from the locality centre, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | about 1.5 km from the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre, named Yelahanka Phase I 10 MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 3 km from the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre |
| Assetz Soho & Sky Phase 1b |
|---|
| about 3 km, to a locality centre |
| Locked |
| Godrej Aveline | about 3 km, to a locality centre | Locked |
|---|
| Sri Rama Enclave | about 4 km, to a locality centre | Locked |
|---|
| Sumadhura Epitome | about 4 km, to a locality centre | Locked |
|---|
| Century Kindle Phase 1 | about 4 km, to a locality centre | Locked |
|---|
| Sobha City Athena | about 4.5 km, to a locality centre | Locked |
|---|
| Sumadhura Solea | about 4.5 km, to a locality centre | Locked |
|---|
| Tnm Lakeview | about 4.5 km, to a locality centre | Locked |
|---|
| Assetz Soho & Sky | about 2.5 km, to a locality centre | 30 Sep 2026 | 100% (114 of 114) | Locked |
|---|
| Cumins Sanctum | about 2.5 km, to a locality centre | 31 Dec 2031 | 29% (32 of 112) | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 3 km, to a locality centre | 31 Dec 2027 | 100% (120 of 120) | Locked |
|---|
| Godrej Aveline | about 3 km, to a locality centre | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|