Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 43 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Hmt Sri Gayathri Serenity in the interactive atlas
Transfer of the land
Sale deed
Survey 380/6
K-RERA filing, land schedule
Approval or registration
Land use converted
BBMP · Survey 380/6
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 380/6
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/5056/25-26IN
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/070426/008573
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 27 Feb 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 5 of the survey sketch. Filed with K-RERA: SURVEY SKETCH, 5 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 380/6 | |
|---|---|---|
| Land extent, Sy 380/6 | 19 (unit not stated) | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,922 sq m | |
| Khata | E Khatha · BBMP · 10 Jun 2025 | |
| Sale deed | Dated 16 Jun 2005 | |
| Title deed | No. KRI-1-04645-2005-06 · Book 1 | |
| Building plan (BBMP) | Sanctioned 30 Aug 2025 · No. PRJ/5056/25-26IN | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 9 Oct 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2029 |
| Land conversion | Converted 27 Sep 2024 · BBMP | |
|---|---|---|
| Survey numbers | 380/6 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 61 m² 58.3%2BHK · avg 45 m² 41.7%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 20 | 489 |
| 3BHK | 28 | 662 |
| Sold, Q2 2026-27 | 0 / 48 | |
|---|---|---|
| Unsold, Q2 2026-27 | 48 |
| Legacy Saviero | about 2 km | Locked | |
|---|---|---|---|
| Assetz Sun & Sanctum - Phase 2 | about 2.5 km | Locked | |
| Vkk Grand | about 3.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 4 km | Locked | |
| 2g Tula | about 4.5 km |
| Hmt Sri Gayathri Serenity This project | This project is the point the others are measured from | 31 Dec 2029 | 0% (0 of 48) | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 2.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, DR AMBEDKAR NAGAR NEAR VIJNANAPURA | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.98 (47 covered spaces for 48 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement
| Main structure | 100% · planned by 1 Sep 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 15 Oct 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 40% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2029 | |
|---|---|---|
| Schedule end | 15 Oct 2027 | |
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 30 Aug 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.99 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 9 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Chartered accountant's certificate, registration | Dated 10 Nov 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.34 Cr 27.8%Development · ₹16.50 Cr 72.2%
| Estimated cost | ₹22.84 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹16.10 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (48) 100%
| Sold, Q1 2026-27 | 0 / 48 · 48 available | |
|---|---|---|
| Sold, Q2 2026-27 | 0 / 48 · 48 available | |
| Unsold, Q2 2026-27 | 48 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | AU Small Finance Bank · Hoodi | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹7.35 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 2 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 27 Feb 2026 | |
| Building plan (BBMP) | Sanctioned 30 Aug 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | AU Small Finance Bank · Hoodi | |
| Nava Skanda Bellavita | about 5 km | Locked |
|---|
| Garuda Grand | about 5 km | Locked |
|---|
| The Pearl Paradise | about 5.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 6.5 km | Locked |
|---|
| Radiance Floresta | about 6.5 km | Locked |
|---|
| Lodha Mirabelle | about 7 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 7 km | Locked |
|---|
| Vkk Grand |
|---|
| about 3.5 km |
| 30 Jun 2027 |
| 49% (59 of 120) |
| Locked |
| SOBHA Victoria Park Phase 1 | about 4 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
|---|
| 2g Tula | about 4.5 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
|---|
| Nava Skanda Bellavita | about 5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| Projects within 4 km, counted | 27 (27 with an approximate location) | |
|---|---|---|
| Flats in them | 6,419 | |
| Booked | 4,199 of 6,419 (65%) | |
| Unsold | 2,220 | |
| Booked a month, pooled | 97 flats | |
| Months to sell, pooled | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2.5 km, Horamavu | |
| Kempegowda Airport | 29.5 | 19.5 |
| MG Road (CBD) | 13.5 | 10.5 |
| Manyata Tech Park | 9 | 7 |
| ITPL, Whitefield | 12 | 7.5 |
| Ecospace, Bellandur ORR | 18 | 11 |
| Electronic City Ph 1 | 30.5 | 20.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km to the south, named ITI on OpenStreetMap |