Overview
In That Quiet Earth Phase 2b
Part ofIn That Quiet Earth4 phases, 1,179 flats
Overview
Part ofIn That Quiet Earth4 phases, 1,179 flats
Overview
Part ofIn That Quiet Earth4 phases, 1,179 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open In That Quiet Earth Phase 2b in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 68 | 24 Jul 2013DC Bengaluru | 18 Sep 2012in favour of Total Environment Constructions Private Limited | 4 Nov 2019A Khatha · BBMP | 1 Acre 02 Guntas |
| Survey 69 | ||||
| 69/1 | 24 Jul 2013DC Bengaluru | 18 Sep 2022in favour of Total Environment Construction Private Limited | 28 May 2020A Khatha · BBMP | 0-08 Guntas |
| 69/2 | 7 Oct 2016DC Bengaluru | 10 Feb 2012in favour of Total Environment Constructions Private Limited | 28 May 2020A Khatha · BBMP | 0-13 Guntas |
| 69/2 (part) | 15 Sep 2012DC Bengaluru | 20 Nov 2017in favour of Total Environment Constructions Private Limited | 28 May 2020A Khatha · BBMP | 1 Acre 14.08 Guntas |
| Survey 75 | ||||
| 75/1 | 28 Jan 2015DC Bengaluru | 27 Oct 2018in favour of Total Environment Constructions Private Limited | 28 May 2020A Khatha · BBMP | 0-11Guntas |
| 75/2 | 15 Aug 2012DC Bengaluru | 18 Oct 2012in favour of Total Environment Constructions Private Limited | 28 May 2020A Khatha · BBMP | 0-10 Guntas |
| 75/3 | 24 Jul 2013DC Bengaluru | 15 Sep 2012in favour of Total Environment Constructions Private Limited | 28 May 2020A Khatha · BBMP | 0-11 Guntas |
| 75/10 | 15 Mar 2013DC Bengaluru | 6 Apr 2013in favour of Total Environment Constructions Private Limited | ||
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Sy 27/11, Bileshivale village, Bangalore East taluk
Title deed filed with K-RERA, pp. 1, 20 · See it in Documents
Transfer of the land
Title deed registered
No. HLS-1-02388-2012-13 · Book 1 · Consideration ₹75.0 L · Sy 75/2, Bileshivale village
Title deed filed with K-RERA, pp. 3, 4, 7 · See it in Documents
Transfer of the land
Title deed registered
No. MDP-1-07921-2017-18 · Book 1 · executed 20 Nov 2017 · Sy 69/2; 75; 74, Bileshivale village, Bidarahalli hobli
Title deed filed with K-RERA, pp. 3, 8, 10 · See it in Documents
Transfer of the land
Title deed executed
Sy 75/1, Bileshivale village, Bidarahalli hobli · 11 Guntas
Title deed filed with K-RERA, pp. 2, 27 · See it in Documents
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 11 Mar 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Matched part of the survey number | 18,019 sq m | |
| The whole survey number on the KGIS map | 22,633 sq m | |
| Extent the filed land schedule names for these survey numbers | 16,499 sq m | |
| Plot area against the filed extent | 1.09 times | |
| Land area filed with K-RERA | 14,527 sq m | |
| Village, hobli and taluk on the KGIS map | Bilisheevale, Bidarahalli-3 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 68, 69/1, 69/2, 69/2(p), 75/1, 75/2 and 2 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 14,527 sq m | |
| Khata | A Khatha · BBMP · 4 Nov 2019; A Khatha · BBMP · 28 May 2020 | |
| Sale deed | Dated 10 Feb 2012, 15 Sep 2012, 18 Sep 2012 and 5 more | |
| Sale deed in favour of | Total Environment Constructions Private Limited, Total Environment Construction Private Limited | |
| Title deed | Consideration ₹74.0 L · Sy 75/10, Bileshivale village, Bidarahalli hobli | |
| Sy. No. 68 | 6 | 1 acre 2 guntas | 1 acre 2 guntas | Differs: 4 guntas apart | 0 | |
| Sy. No. 69/1 | 6 | 8 guntas | 0 | |||
| Sy. No. 69/2 | 6 | 2 acres 6 guntas | 0 | |||
| Sy. No. 75/1 | 1 | 11 guntas | 0 | |||
| Sy. No. 75/2 | 1 | 10 guntas | 0 | |||
| Sy. No. 75/3 | 2 | 11 guntas | 0 | |||
| Sy. No. 75/10 | 1 | 14 guntas | 0 |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 3 Mar 2022 · No. BBMP/Addl.Dir/JDNORTH/0031/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/112/2019 | Clear |
| Environmental clearance | SEIAA 151 CON 2018 · issued 21 Sep 2019 | Clear |
| Airport height NOC (1 of 2) | NOC ID JAKK/SOUTH/B/040919/386138 · issued 28 May 2019 · permissible top elevation 1006.74 m above mean sea level · valid until 27 May 2027 | Clear |
| Airport height NOC (2 of 2) | issued 4 Jun 2019 · permissible top elevation 1005.34 m above mean sea level · valid until 3 Jun 2027 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 1 May 2028 |
| Land conversion | 8 of 8 parcels converted | |
|---|---|---|
| Sy 68, 69/1, 75/3 | Converted 24 Jul 2013 · DC Bengaluru | |
| Sy 69/2 | Converted 7 Oct 2016 · DC Bengaluru | |
| Sy 69/2(p) | Converted 15 Sep 2012 · DC Bengaluru | |
| Sy 75/1 | Converted 28 Jan 2015 · DC Bengaluru | |
| Sy 75/2 | Converted 15 Aug 2012 · DC Bengaluru | |
| Sy 75/10 | Converted 15 Mar 2013 · DC Bengaluru | |
| Survey numbers | 68 · 69/1 · 69/2 · 69/2(p) · 75/1 · 75/2 · 75/3 · 75/10 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
L21 · avg 160 m² 66.7%L25 · avg 196 m² 33.3%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| L21 | 216 | 1,723 |
| L25 | 108 | 2,108 |
| Sold, Q2 2026-27 | 319 / 324 | |
|---|---|---|
| Unsold, Q2 2026-27 | 5 |
| SOBHA Victoria Park Phase 1 | about 2 km | Locked | |
|---|---|---|---|
| Nava Skanda Bellavita | about 2.5 km | Locked | |
| The Pearl Paradise | about 2.5 km | Locked | |
| Vkk Grand | about 3 km | Locked | |
| Radiance Floresta | about 3.5 km |
| In That Quiet Earth Phase 2b This project | This project is the point the others are measured from | 1 May 2028 | 98% (319 of 324) | Not verified yet |
|---|---|---|---|---|
| SOBHA Victoria Park Phase 1 | about 2 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 2.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Richi's Garden | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.13 (689 covered spaces for 324 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 30% · planned by 29 Nov 2024 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 20 Jun 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 10% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 10 Mar 2028 | |
| RERA completion date | 1 May 2028 | |
| Work began, as filed | 30 Apr 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 86 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 400 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/112/2019 | |
| Environmental clearance | SEIAA 151 CON 2018 · issued 21 Sep 2019 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 9 Apr 2022 | |
| Engineer's certificate, registration | Dated 10 Apr 2022 | |
Land · ₹36.41 Cr 4.8%Development · ₹728.97 Cr 95.2%
| Estimated cost | ₹765.38 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹416.82 Cr | |
| Cost incurred | ₹378.73 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹601.44 Cr | |
| Land cost revision | Not verified yet | |
Sold (319) 98.5%Unsold (5) 1.5%
| Sold, Q3 2025-26 | 319 / 324 · 5 available | |
|---|---|---|
| Sold, Q4 2025-26 | 319 / 324 · 5 available | |
| Sold, Q1 2026-27 | 319 / 324 · 5 available | |
| Sold, Q2 2026-27 | 319 / 324 · 5 available | |
| Unsold, Q2 2026-27 | 5 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 | |
| 3 BHK, sold | 319 / 324 |
| Escrow bank | Standard Chartered Bank · Koramangala Branch | |
|---|---|---|
| Designated account, collected | ₹52.8 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹52.8 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 1 | |
| Complaints filed against the promoter | 9 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 11 Mar 2022 | Review |
| Building plan (BBMP) | Sanctioned 3 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Standard Chartered Bank · Koramangala Branch | |

| 28 May 2020A Khatha · BBMP |
| 0-14 Guntas |
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0031/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/060722/005044
K-RERA registration ·
| Locked |
| Adarsh Pinecourt | about 3.5 km | Locked |
|---|
| Legacy Saviero | about 3.5 km | Locked |
|---|
| Sattva La Vita | about 4.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 4.5 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | Locked |
|---|
| Sobha City Athena | about 5.5 km | Locked |
|---|
| Sumadhura Solea | about 5.5 km | Locked |
|---|
| The Pearl Paradise |
|---|
| about 2.5 km |
| 31 Dec 2026 |
| 72% (23 of 32) |
| Locked |
| Vkk Grand | about 3 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Radiance Floresta | about 3.5 km | 31 May 2028 | 100% (65 of 65) | Locked |
|---|
| Adarsh Pinecourt | about 3.5 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
|---|
| Projects within 4 km, counted | 39 (39 with an approximate location) | |
|---|---|---|
| Flats in them | 8,093 | |
| Booked | 4,248 of 8,093 (52%) | |
| Unsold | 3,845 | |
| Booked a month, pooled | 124 flats | |
| Months to sell, pooled | 31 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 4.5 km, HRBR Layout | |
| Kempegowda Airport | 25.5 | 16.5 |
| MG Road (CBD) | 15 | 12 |
| Manyata Tech Park | 9.5 | 6 |
| ITPL, Whitefield | 15 | 10 |
| Ecospace, Bellandur ORR | 21 | 14.5 |
| Electronic City Ph 1 | 32.5 | 24 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 3 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |